False progress
Reporting that things are nearly done, with nothing to show for it.
Where it comes from
This one is not in the manual. It is one of three patterns Rapora added, because the 1944 list does not name it and modern meetings are full of it.
How it sounds today
The status round reaches an item that is late. The answer is warm and brief: basically done, a few small things left. The same answer was given two weeks ago. Nobody asks further, because asking sounds like distrust. The item surfaces a month later as a crisis.
- "Yes, that's basically done."
- "It's nearly finished, just a few small things left."
- "That's all under control, nothing to worry about."
When it is legitimate
A short update is fine when it carries facts: "eight of ten modules are tested, the last two are booked for Thursday, the open risk is the supplier certificate". Optimism with specifics is a report.
The test: Is there a date, a number or a named blocker in the answer? And if the same item was "nearly done" last time, what has changed?
Why people do it
Status meetings teach it. Where a late report brings a public grilling and "on track" brings silence, people learn which answer to give. Often the speaker believes it, too: the last tenth of a task hides most of the surprises.
What helps
- Ask for status in a fixed form: what is finished, what is left, what could stop it.
- Answer bad news with help, visibly. People watch what a red status costs.
- Keep the last report in view, so that "nearly done" twice in a row becomes a question.
A question for the team
Is it safer in our meetings to say "on track" than to say "late"?
Patterns, never people
One sentence proves nothing. The introduction says how to use these entries, and how not to.